Construction
USA
Layout
1x5T
The New T1 Project includes multiple enhancements to the existing Terminal. Upon completion, the terminal will have a total of 30 gates after the 11 new gates are constructed with associated seating areas, security checkpoints, and restaurants. A new three-lane entry roadway will be constructed to increase access to the terminal while easing congestion from other entry roadways, a two-level roadway and curb front will separate array and departure traffic to further streamline traffic